The Energy Connect Project

Ways of Working

Project EnergyConnect is the high voltage electricity transmission interconnector to be constructed between Robertstown in SA and Wagga Wagga in New South Wales (NSW), with an added connection from Buronga in NSW to Red Cliffs in north-west Victoria

An electricity interconnector is a connection that allows power to flow between regions in the National Energy Market (NEM), providing access to a larger number of electricity generators. Project EnergyConnect is being delivered jointly by ElectraNet and TransGrid (the NSW electricity transmission operator).

The Project will be one of Australia’s largest energy infrastructure Projects and the first new interconnector between Australian States in over 15 years.

This session will cover:-

  • Project EnergyConnect Objectives
  • Regulatory Approvals
  • Procurement Considerations
  • Design Considerations
  • Scope of Work

REGISTER NOW

event20211018c.jpg

It is no longer possible to register for this event

It is no longer possible to register for this event

Information

Type of category: Member Events

Type of activity: Ways of Working

Date: 18 October 2021

Hour: 17:30 to 19:30

# of PDUs: 0.0

Price

Location

Hotel Ibis Adelaide

122 Grenfell Street
Adelaide, SA, 5000

[Click here for Map and Directions]